Location: Hillsboro, OR
Size: 1,300,000 SF
Architect: CH2M Hill
Client: Confidential
Cost: Confidential

Hoffman built this prototype fab for the world’s leading manufacturer of microchips in just 14 months. The project was constructed on a crowded manufacturing campus, with complex and sensitive tie-ins to the operational facility. This advanced factory is the model for the next generation of fabrication plants and features cleanroom space, a process utility building, a boiler-chiller plant, and several support buildings. It required the use of one of the largest cranes in the world, a 2,600-ton Lampson crane.